The University of Utah Home J. Willard Marriott Library Home
Please take a moment to fill out our survey
To link to this object, paste this link in email, IM or document

To embed this object, paste this HTML in website
" />

(Fig. 24b) "Wayne Thomas, mining engineer in charge, and a party of visitors inspecting preparations for pouring the concrete for the retaining wall to hold out surface water and sand until a reenforced [sic] concrete collar could be constructed on the bed-rock [sic] about 15 feet below the surface. Note several sacks of gilsonite salvaged from the vein in order to make room for the shaft collar."

  •  
  •  
  •  
  •  
  •  
Loading content ...
you wish to report:
Your comment:
Your Name:
...
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK