Seminary Building Dedication

Update Item Information
Title Seminary Building Dedication
Identifier 2539T
Creator Leo C. Thorne
Subject Church--The Church of Jesus Christ of Latter-day Saints--Seminary--Building Dedication--Lela Batty; Mable Stagg
Description Mable Stagg and Lela Batty participated in the dedication of the Vernal Seminary Building. A year of unselfish volunteer work and donations will be culminated Sunday, September 18 when Sterling W Sill, Assistant to the Council of the Twelve in The Church of Jesus Christ of Latter-day Saints, dedicates the new seminary building. Most of the cost of the edifice was raised by the donations of local people appreciation is due local business houses and businessmen for their great help in making this construction possible, commented President Archie Johnson at the dedication. The cost of the building was $40,000. Construction was done under the direction of Glen Oaks, building supervisor.
Date 1955-09-18
Type Image
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2013 Uintah County Library
Source Physical Dimensions 1734 X 1759 pixels
Archival Resolution 800 dpi
Bit Depth 8 bit
Scanning Device Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6c28brn
Setname ucl_tp
ID 408643
Reference URL https://collections.lib.utah.edu/ark:/87278/s6c28brn