Title |
Flaming Gorge Suspension Bridge Construction |
Identifier |
759-03.tif |
Subject |
Construction--Bridges--Suspension Bridge |
Spatial Coverage |
Flaming Gorge (Utah) |
Description |
These steel cables, placed across the Green River, support the suspension bridge that will be and important link between Vernal and Dutch John and Flaming Gorge construction area. The bridge, scheduled for completion by June 1959, will enable Dutch John residents to visit Vernal with the minimum of difficulty. With the completion of the bridge and the road the present 98 mile drive will be cut in half. |
Source Collection |
Vernal Express Collection |
Source Material |
B&W Copy Negative and Print |
Publisher Digital |
Uintah County Library Regional History Center |
Date |
1959-04-23 |
Type |
Image |
Format |
image/jpeg |
Language |
eng |
Rights |
Digital image, copyright 2005 Uintah County Library |
Source Physical Dimensions |
6cm X 6cm |
Archival Resolution |
4800 X 3400 pixels; 2500 ppi |
Low Resolution |
800 X 600 pixels |
Bit Depth |
8 |
Scanning Device |
Creo-Scitex Jazz + flatbed scanner |
Scanning Technician |
Aric Hansen |
ARK |
ark:/87278/s62v5zxb |
Setname |
ucl_vep |
ID |
1090425 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s62v5zxb |